无忧范文网小编为你整理了多篇《英文自我评价范文》范文,希望对您的工作学习有帮助,你还可以在无忧范文网可以找到更多《英文自我评价范文》。
第一篇:工作自我评价英文范文
仅仅由别人的评价来判定自己是不全面的,当自己也沉淀下来,窥探自己的内心,写下自己的自我评价,这样才可以不断进步。但是自我评价要怎么写呢?下面是学习啦小编为大家带来工作自我评价英文范文,相信对你会有帮助的。
工作自我评价英文范文篇一Engineering Department - × × × According to the recent emergence of individual employees of the implementation of the poor, low efficiency and poor coordination between departments and other issues, is to reflect on their work, the specific situation is as follows:
1, the implementation of force: in their daily work in strict accordance with the requirements of the project management standards for inspection and construction, but sometimes the requirements of the construction team lax, problems; like security, on-site health issues; work is not deep enough, The specification is not detailed enough. As the daily work has been generally mastered, the work has been focused on communication, arrangement, implementation, subjective that this is the focus, if the implementation process to do more detailed, some things will achieve better results, but also lead to some deep-seated The problem can not be fully grasped.
2, work efficiency: sometimes in the daily work and the construction unit communication is not enough, mentality sometimes more impetuous, can not calmly solve the problem; mainly due to the lack of fulfillment of duties, lack of sense of responsibility to work hard enough, not fine, the work is completed Can do further checks, the quality of work can not be guaranteed, or even do useful work, low efficiency.
3, with the department: the engineering department as the company logistics department, mainly for the workshop and department services, but I do not good enough in the service, the overall sense is not strong enough, work only from their own work, sometimes with personal work Emotions, not threw himself into the work, the service is not enough fine, too much surface to deal with the problem.
The above problems are mainly lack of their own sense of responsibility, do not work hard to deal with; sense of responsibility, the overall situation is not strong enough, ignoring the work of enthusiasm, initiative, creativity, there is a contentment to the existing level of thinking.
In the future work, I must further improve the work style, we must strive to be good at overcoming negative thinking, get rid of irritable mood; strengthen self-building, and strive to learn their own work needs professional knowledge and business skills, better work methods and work, selfPressure always maintain a positive mental state, high standards and strict requirements, to do their jobs.
工作自我评价英文范文篇二In the company's three months of probation, I quickly adapted to the new work, into the new team, also received the recognition of colleagues and leaders in their teaching and training, their thinking, work, study And other aspects have made certain achievements, the overall quality of individuals has also been a certain increase, now I have three months to work, study the situation for a brief summary report.
As a newly graduated college students, although there have been professional knowledge of learning, but the practice of things less contact, do not understand a lot of problems. I started to do the data professional, not familiar with a lot of processes, do not know how to do this professional work, in which case, I rely on the teacher's guidance, and their own serious learning, contributed to their knowledge structure Perfect and sound system of knowledge, so that their own as soon as possible, familiar with the work as soon as possible, less detours. After a period of time, I was borrowed to the Nanjing project team to do the wireless, in contact with new unfamiliar areas, the lack of experience, business knowledge requires a re-learning process, their colleagues in other help, can quickly overcome this The state into a new work life. Do not understand the problems encountered on the humbly ask other colleagues to see do not understand or do not draw the map on their own data, read the previous drawings, as much as possible to solve their own problems, do not disturb other colleagues, whether it is just to the company When learning to follow the teacher or an independent work in the completion of the affairs, are able to conscientiously, conscientiously.In daily life, I seriously obey the leadership arrangements, abide by the rules and regulations and the requirements, develop good work style.
In the learning process, I know that there are still some shortcomings and deficiencies, mainly in the following areas:
1, the company is not familiar with the process, the combination of theory and practice to do poor;
2, the company's work tasks can be seriously completed, but the enthusiasm is not enough;
3, with the company's leadership and colleagues in the exchange of ideas and work is not enough;
4, their overall quality and business learning to be further improved.
Over the past three months, is constantly learning, and constantly enrich the three months, is actively exploring, and gradually grow up in three months.Of course, entering the workplace, inevitably inexperienced, in business knowledge, and their own work requirements there are still some gaps. But these experiences also let me continue to mature, in dealing with a variety of issues to consider a more comprehensive, professional skills have been strengthened. Here, I would like to thank the leadership of the company and my colleagues to cultivate the guidance of my induction and help, for their mistakes in my work reminders and corrections. I also know that graduation is only a small step in school, society is a real university. In future work, I will strive to identify their own position, to do their best to contribute to the company for the company to create real wealth, but also for their own to seek a greater progress.
工作自我评价英文范文篇三In accordance with the brigade, "Reflection Day system of notice," the spirit of my work and the actual "notice" requirements compared to view the content, found that there are some specific problems, and from their own inner reflections are as follows:
1, political theory of learning is not enough. Seeking truth from facts, I still love to learn, but in recent years, their learning is not as hard as before.There is a tendency of pragmatism, one is not enough hard work. Always feel that they accept the fast, use the time to learn at any time, keep up.Second, in-depth thinking is not enough. Their usual learning, is a shallow understanding of the level, memory, no serious thought, not from a deeper level to understand and grasp, and to guide the actual work. Third, the theory is not enough to guide practice. Usually after learning, not good at using the theoretical point of view and methods to guide the work to promote.
2, the concept of serving the people not deep understanding, not through.Do their own work, do good things for the masses, do practical things, correctly handle the various interests of the concept is to achieve the purpose of the most basic form. In general, there is a gap in the consciousness of action. Sometimes feel in the actual work, in specific action is difficult to accurately grasp, not completely do a good job and work closely with the practice.
3, the way of thinking is not enough science. First, understanding the problem is biased. The study of the political situation is less sensitive is not strong, always feel to understand the overall situation, to grasp the dynamics of the outside world, the development of principles and policies is a superior thing, leadership, he is the executor, as long as the superior spirit of the implementation of the letter Implementation on the line, the lack of awareness of the overall situation and the sense of urgency. This idea is wrong, one-sided, that their immaturity.
So in the future work, study, life process I have to make up for deficiencies now, improve self: First, we must further strengthen the political business learning, improve their own quality. Adhere to the theory with practice, seek truth from facts, emancipate the mind. Strengthen their ideological transformation, advance with the times, blaze new trails, and strengthen the concept of serving the people, so that his words and deeds are reflected in the image of urban management and law enforcement officers.
Second, to further emancipate the mind, to adapt to work needs. With new thinking to discover and solve various problems encountered in the work, therefore, in the future work, will be learning as the carrier, pay attention to the liberation of ideas, the concept of innovation, innovative ideas and methods of work to adapt to Work needs.
第二篇:英文的工作自我评价范文
Blink of an eye 10 years have gone, we ushered in a new year. Summing up the work of the past year, from a personal point of view about the measurement of awareness.
Quality is the life, quality is the fundamental guarantee for enterprise development. In the fierce competition in the construction market today, how to improve the construction quality management level is every enterprise managers must think about. Factors affecting the quality of construction in all aspects. From the engineering measurement point of view, analyze the work of measuring the pay-off to ensure and improve the quality of the construction of an important role, and simply how to strengthen the management of measurement work to improve the quality of construction.
It is a very important technical work of municipal road engineering that the measuring and measuring line is an important technical work. It is inseparable from the whole process of construction, from the preparation before construction to the completion of the construction, to the final acceptance after construction. How to do a quick and good measurement of the line, is a basic technical skills and test the basic requirements.
Do the measurement before the commencement of the end
Before the start of the project, the survey and design units shall be responsible for on-site surveying and settlement according to the design documents, and the site standard point, conductor piles and crossing point piles shall be clearly identified according to the design drawings. Within the measurement of signs, must take appropriate protection measures. On the measurement of the end, it is necessary to emphasize the protection of pile position, that is, in the design unit after pile, should be timely use of brick piers or pouring cement pier and other methods to be protected, so as not to lose. These piles are generally farmland or residential areas, it is easy to be man-made destruction, and once destroyed, let the survey and design units to fill test, then delay the construction, but also increase the cost.
Midline retest and edge loft
Center line measurement is based on the alignment measurement, the road center line plane position on the ground marked in detail. It is the difference with the alignment measurement is: alignment measurement, but the intersection of the road and the straight line segment of the necessary turning point marked out, and in the midline measurement, according to the intersection and the turning point with a series of stakes will road straight Segment and curve segments are specified in detail on the ground.
The alignment survey is usually carried out by the survey and design units, and then the pile and measurement results to the construction side, the construction unit by the middle line and construction measurement.
Subgrade construction should be fully restored before the center line, according to the restoration of the pile in the road and the relevant provisions of the roadbed side of the pile. On the midline re-measurement and edge lofting, should pay attention to the following points;
One should pay attention to the distance between the intersection, the direction is consistent with the drawings; such as an engineering project has several tenders, should pay attention to the center of the adjacent tenders are closed, midline measurements should be in-depth adjacent tenders 50 ~ 100 M; attention should be paid to the center of the structure such as bridge and culvert is closed; should pay attention to the relative position of the building and other buildings and drawings are consistent. If you find problems in a timely manner to identify the reasons for the design unit.
Second, retaining pile set. It is very important to set up pile protection pile in the middle of the road, but these piles are easy to be destroyed during the construction. Therefore, it is necessary to carry out the restoration and surveying work of the middle pile during the construction of the roadbed. In order to quickly and accurately restore the center pile in the original position, must be on the road before the construction of the main control point of the pile such as the intersection point, turning point, curve control points set up retaining pile. The so-called retaining pile, is outside the scope of the construction is not easy to be destroyed where some stakes set up.According to these pile, with simple methods (such as the intersection point, range, etc.), you can quickly restore the original pile point.
Set the pile should pay attention to the following aspects: in each straight section of the road, at least three control piles to set up retaining pile, so even if there is a control pile can not be restored, the other two points can be used to restore the straight section To the original position; the intersection angle of the two direction lines as close as possible to 90 °, should not be less than 30 ° angle of intersection; retaining pile should be selected outside the scope of construction, but not too far away; Pile distance can not be too far; The retaining pile must be solid and reliable, pile to facilitate the erection of measuring instruments and observation.
Set up retaining pile of curve side. For the curve segment, because of the more difficult to determine the side of the pile, re-measuring time-consuming more, so after a precise line, the edge of the curve section of the pile pile should also be set representative pile, which can reduce Repeat the measurement, reducing the measurement workload.
Third, the laying of mileage pile. After the midline pile is fixed, it is possible to lay out the control pile of the mileage pile on this basis. Mileage pile layout principle is: in the straight section, generally arranged in every 100 meters of the entire pile of cross-section, similar to the common road construction 100 meters pile layout; in the curve section of the pile to be properly encrypted, in the curve Mileage pile can be large stakes, above the mileage mark with paint or ink station, into the road outside the scope of construction on both sides of the ground, it is best to play on each side of a . To ensure that the construction is not easy to damage the case, from the embankment edge should be as close as possible to facilitate the use, generally 1 to 2 meters.
The laying of mileage piles is not addressed in most of the surveying and setting-out sections of the Construction Manual, and is not taken into account at many sites. I found in some sites, some construction technicians in the construction survey, the determination of the distance station is a long distance from a foot a foot row over, not only a waste of time and prone to cumulative error. If the mileage stakes are not allowed, then the elevation, slope quality control is out of the question.
Third, the proofreading and additional standard point
First, the use of design units set up before the standard point should be carefully checked, close the gap may not exceed the limit, such as exceeding the allowable deviation should identify the reasons and promptly reported to the relevant departments. The design unit delivers the leveling points normally set several months ago. These points in the field can easily be man-made collision or natural subsidence due to the ground changes, so be sure to carefully review before use; Second, the standard point of additional principles: the distance is generally 150 to 200 meters, Plus transfer station for the principle. The additional standard point should be closed with the design unit to pay the standard point, such as an engineering project at several tenders, but also with the adjacent standard segment of the standard point of closure, the closure may not exceed the limit.
The position of the leveling point shall be located on a solid, non-sinking, non-touching ground or a solid building of a permanent building. Can also be installed in the protection of deep-buried wood piles or concrete piles, and make clear signs. The leveling point should be checked once a month, and the level of the spot where the movement is suspected should be checked after re-inspection.
Vertical and horizontal cross-section measurement
Through the midline re-test, side piles line and the laying of the standard point, you can measure the vertical and horizontal cross-section. The main purpose of vertical and horizontal cross-section measurement is to calculate the amount of earth, so the vertical and horizontal cross-section measurement after the end of the measurement results should be checked with the design drawings. Where the results with the original within the allowable deviation, the original results shall prevail, and only when there are significant differences with the original results, can be reported to the supervisory engineer after verification changes. It should be noted that: the work must be carried out before construction. If the measured amount of earth and the design does not conform to the supervision of the approval should also be carried out before construction.Some site excavation to the supervisor before the actual amount of earthwork and design does not match, require additional visa, but the final supervision refused.So be sure to pay attention to the timeliness of the work.
第三篇:简短的英文自我评价范文
★ I have received formal education, with good quality, willing to learn to forge ahead, in the company during the work has accumulated a certain amount of work experience, can be efficient and timely completion of the task.
★ stable personality, mature, honest man, helpful, with a high sense of responsibility.
★ work attitude: a very good team spirit and spirit of collaboration, positive work attitude, able to work in different cultures and the excellent background of the staff.
★ I am patient, self-motivation, willing to endure hardship, self-learning ability, can be very good to communicate with people.
★ I am eager to learn motivated, honest, dedicated, strong sense of responsibility, a strong group spirit, serious and positive work, rigorous and responsible.
★ cheerful, adaptable, honest, good communication with people, have good interpersonal skills, with relevant professional knowledge and seriousness.Attentive, patient work attitude and good professional ethics.
★ I believe that the collective spirit of the work of a serious and responsible, as long as I can do, I will be able to do its best, I can not do I will do my best to do it better.
第四篇:英文的工作自我评价范文
First, have good work skills
Cashier external units more settlement, is an image window; internal is a service window, internal staff reimbursement is frequent, is a masters. So I have to do is not confused, tickets on the spot error-free, inventory cash fast and accurate, not only to grasp the financial policy, dry up the work also handy, have strong operational capacity, plans, computer, Money everything is accurate, busy and not chaos.
Second, the sense of innovation
In the eyes of many people is a major invention of innovation is what, it is not true, as long as the actual work from the start, to improve the actual work, to promote practical work to a new level, is innovation. I have this spirit. I work for the staff reimbursement of travel expenses, reimbursement and the original invoice paste sheet, are made through my reasonable proposals after the improvement of the voucher paper size selection, the original document paste single filling format, the original paste Single requirements of the content design, font layout requirements, printed on the back of the original paste operator note, not only to improve the work, more importantly, is to put the accounting file binding and management.
Third, there is a responsible attitude
1, the strict implementation of cash management and settlement system, regular checks to the accounting cash and accounts and found that the amount of cash does not match, so that timely treatment.
2, the timely recovery of the company's income, out of receipts, cash withdrawals in time to the bank, never sit cash.
3, according to the basis for providing accounting, teaching staff wages and other timely payment of funds to be paid.
Fourth, there are honest and clean spirit
Constantly improve their professional ethics, the cashier is a special occupation, it is in contact with a lot a day a lot of money, tens of thousands of banknotes, really worthy of the hands of family wealth. Without good professional ethics, it is difficult to pass the "money off." Compared with other accountants, as a cashier I should strictly abide by.
Work always have errors, as long as we find out the reasons from each trip, summed up the lessons, failing to make the same mistakes, our work will continue to progress, slowly there will be improvement, in fact, excellent On the original in the occupation of a good work habits.
第五篇:员工转正自我评价的英文
1、协助部门同事为公司员工办理工资卡。为了保护公司资金的安全使用,听从主管领导的安排,协助同事为公司员工办理工资卡,使员工工资及时发放。
2、协助部门同事认真审核各部门报销的费用原始单证。计划财务部门是公司的监管及服务的窗口,为了更好地为公司员工服务及合理地利用公司资金,我积极、认真地学习了公司的管理体系,在审核报销单证时,坚持坚持贯彻执行公司财务管理制度。对手续不全,费用项目不明确的单证,退回经办人重新填制。
3、严格履行岗位职责,努力做好本职工作,对上级安排工作任务做到及时、细致、周全完成。在本部门的工作中,我一直严格要求自己严以律已,拾遗补漏,不断地发现问题,解决问题,总结原因,积累经验,从而完善和提升公司的管理机制,能认真执行保密制度,认真及时做好领导布置的每一项任务,同时主动为领导分忧,帮助同事做一些自己力所能及的事情。
4、对江苏项目公司调拨过来的实物资产及海南项目公司所购实物资产清盘,并建成电子文档保存。为了杜绝公司实物资产虚增的可能性,对每笔费用报销所涉及到的实物资产项目进行严格细致审核,对盘点到的所有实物资产及报销凭证所列资产进行一一核对。为了避免项目公司调拨过来的实物资产不遗失,进行了二次盘点,如有变动,及时进行调整。
第六篇:自我评价英文版范文
My name is . I'm years old. I graduated last year. My major is Hotel Management. I am now familiar with hotel management. Since my internship, I have worked in multiple departments. I have worked as a room clerk a year since my graduation, so I'm quite familiar with the Opera system and have accumulated some e*perience in room management. I love surfing the internet in my spare time and as well as shopping and sports.
I hope I have a good chance to grow with your hotel if I could join you.